Product information
Overview
Key Features
- ET 200SP CPU: CPU 1510SP-1 PN for ET 200SP with 1 integrated IO Controller and 1 PROFINET interface.
- PROFINET IRT interface: PROFINET IRT with a 3-port switch, 72 ns typical bit-operation performance, and support for PROFINET IO Controller and IO Device functions.
- Program and data capacity: Integrated work memory for the program: 100 kbyte; maximum DB size: 750 kbyte. The maximum DB size is 64 KB for DBs with absolute addressing.
- Supply and current: Rated supply voltage: 24 V DC; permissible range: 19.2 V to 28.8 V DC. Rated current consumption: 0.6 A; maximum: 0.9 A.
- Required configuration components: A SIMATIC Memory Card is required. A BusAdapter is required for port 1 and port 2; compatible BusAdapters include BA 2x RJ45, BA 2x FC, and BA 2x M12.
- Engineering and lifecycle: Configurable/integrated with STEP 7 TIA Portal from V17 (FW V2.9) / V13 SP1 Update 4 (FW V1.8) or higher. Product cancellation.
Technical Summary
| Product type | CPU 1510SP-1 PN |
|---|---|
| Supply voltage | 24 V DC rated; 19.2 V to 28.8 V DC permissible range |
| PROFINET interface | 1; PROFINET IRT with 3-port switch |
| PROFINET IO functions | IO Controller and IO Device |
| Bit-operation performance | 72 ns typical |
| DB size | 750 kbyte maximum; 64 KB maximum for DBs with absolute addressing |
| Memory card | SIMATIC Memory Card required |
| BusAdapter | Required for port 1 and port 2 |
| STEP 7 TIA Portal | V17 (FW V2.9) / V13 SP1 Update 4 (FW V1.8) or higher |
Frequently Asked Questions
What is the exact product type of Siemens 6ES7510-1DJ01-0AB0?
It is a CPU 1510SP-1 PN for ET 200SP.
What supply voltage does this CPU use?
The rated supply voltage is 24 V DC, with a permissible range of 19.2 V to 28.8 V DC.
Which components are required for the configuration?
A SIMATIC Memory Card is required, and a BusAdapter is required for port 1 and port 2.
What PROFINET interface does it have?
It has 1 PROFINET interface with PROFINET IRT and a 3-port switch.
What should I provide for an MRO or project quotation?
Provide the required quantity, destination, and project-list context for verification and quotation.
