Product information
Overview
Key Features
- High-overload output: Rated power: 5.50 kW | 7.50 hp (HO); rated current: 13.20 A; maximum output current: 27.00 A.
- Low-overload output: Rated power: 7.50 kW | 10.00 hp (LO); rated current: 18.00 A.
- Integrated drive functions: Has an integrated Class A filter and braking chopper; approved for CU firmware version V4.6.
- Input and output ratings: Input: 3 AC, 380 … 480 V ±10 %, 47 … 63 Hz. Output: 3 AC, rated voltage 400V IEC | 480V NEC.
- Connections and motor cable length: Line-side and motor-end plug-in screw terminals accept 1.50 … 6.00 mm2 (AWG 16 … AWG 10). Maximum motor cable length: 50 m (164.04 ft) shielded or 100 m (328.08 ft) unshielded.
- Mechanical configuration and protection: Frame size FSB; dimensions 100 mm (3.94 in) W × 292 mm (11.50 in) H × 165 mm (6.50 in) D; protection IP20 / UL open type. Without control unit and panel.
Technical Summary
| Product | SINAMICS POWER MODULE PM240-2 |
|---|---|
| Order number | 6SL3210-1PE21-8AL0 |
| High-overload rated power | 5.50 kW | 7.50 hp |
| Low-overload rated power | 7.50 kW | 10.00 hp |
| Input | 3 AC, 380 … 480 V ±10 %, 47 … 63 Hz |
| Maximum output current | 27.00 A |
| Output frequency for vector control | 0 … 200 Hz |
| Output frequency for V/f control | 0 … 550 Hz |
| Integrated functions | Class A filter and braking chopper |
| Protection | IP20 / UL open type |
| Frame size | FSB |
Frequently Asked Questions
What is the exact Siemens product in this configuration?
It is SINAMICS POWER MODULE PM240-2, order number 6SL3210-1PE21-8AL0.
What are the high- and low-overload output ratings?
High overload: 5.50 kW | 7.50 hp, 13.20 A rated current. Low overload: 7.50 kW | 10.00 hp, 18.00 A rated current.
What input supply does the power module use?
The input is 3 AC, 380 … 480 V ±10 % at 47 … 63 Hz.
What is included or excluded from the configuration?
It has an integrated Class A filter and braking chopper. It is without a control unit and panel.
What information should I provide for a quotation?
Provide the required quantity, destination, requested date, and any project list or verification details.
