Product information
Overview
Key Features
- Power and overload ratings: High overload: 2.2 kW at 200% for 3 s, 150% for 57 s, and 100% for 240 s at an ambient temperature of -10 to +50 °C. Low overload: 3 kW at 150% for 3 s, 110% for 57 s, and 100% for 240 s at an ambient temperature of -10 to +40 °C.
- Supply and integrated functions: Supply: 380-480 V 3 AC +10/-10%, 47-63 Hz. The module has an integrated Class A filter and integrated braking chopper.
- Mechanical configuration: Frame size: FSA. Dimensions HxWxD: 238 x 126 x 171 mm.
- Protection and exclusions: Degree of protection: IP20-PT. The configuration is without a Control Unit and operation panel.
- Firmware release: Released as of Control Unit firmware version V4.6.
- Lifecycle status: Product cancellation.
Technical Summary
| Product type | SINAMICS Power Module PM240-2 |
|---|---|
| Order number | 6SL3211-1PE18-0AL1 |
| Supply | 380-480 V 3 AC +10/-10%, 47-63 Hz |
| High overload | 2.2 kW at 200% 3 s, 150% 57 s, 100% 240 s; ambient temperature -10 to +50 °C |
| Low overload | 3 kW at 150% 3 s, 110% 57 s, 100% 240 s; ambient temperature -10 to +40 °C |
| Integrated filter | Class A |
| Integrated braking chopper | Yes |
| Frame size | FSA |
| Degree of protection | IP20-PT |
| Included configuration | Without Control Unit and operation panel |
Frequently Asked Questions
What is the exact product type and order number?
It is a Siemens SINAMICS Power Module PM240-2, order number 6SL3211-1PE18-0AL1.
What overload ratings does this power module have?
High overload is 2.2 kW at 200% for 3 s, 150% for 57 s, and 100% for 240 s at -10 to +50 °C. Low overload is 3 kW at 150% for 3 s, 110% for 57 s, and 100% for 240 s at -10 to +40 °C.
What are the supply and protection specifications?
Supply is 380-480 V 3 AC +10/-10% at 47-63 Hz, with IP20-PT degree of protection.
Which components are excluded from this configuration?
It is without a Control Unit and operation panel.
What information should I provide for a quotation?
Provide the required quantity, destination, requested date, and any project list or verification details.
