Product information
Overview
Key Features
- Motor performance: Optimum power: 2.6 kW; optimum speed: 2,000 rpm; rated torque: 12.5 Nm (100 K).
- Absolute Encoder feedback: Encoder AM20DQI: absolute Encoder 20 bits with resolution 1048576 and 12 bits multi-turn with a traversing range of 4096 revolutions; DRIVE-CLiQ interface.
- Mechanical configuration: Permanent-magnet synchronous motor with plain shaft, IM B5 (IM V1, IM V3) design, and holding brake.
- Connections and cooling: M23 electrical connectors for signals and power are rotatable; cooling: Natural cooling.
- Protection and monitoring: Degree of protection: IP65; temperature monitoring uses a Pt1000 temperature sensor.
- Supply and brake data: Holding-brake power supply voltage: DC 24 V ± 10 %; holding torque: 22.0 Nm; opening time: 200 ms; closing time: 60 ms.
Technical Summary
| Product | SIMOTICS S permanent-magnet synchronous motor |
|---|---|
| Optimum power | 2.6 kW |
| Optimum speed | 2,000 rpm |
| Rated torque (100 K) | 12.5 Nm |
| Encoder system | Encoder AM20DQI: absolute Encoder 20 bits (resolution 1048576, Encoder-internal 512 S/R) + 12 bits multi-turn (traversing range 4096 revolutions) |
| Interface | DRIVE-CLiQ |
| Design | IM B5 (IM V1, IM V3) |
| Connector size | M23 |
| Cooling | Natural cooling |
| Degree of protection | IP65 |
| Holding brake | Permanent-magnet brake; holding torque 22.0 Nm |
Frequently Asked Questions
What feedback system does Siemens 1FK7083-2AC71-1RH1 use?
It uses Encoder AM20DQI, an absolute Encoder with 20 bits, resolution 1048576, Encoder-internal 512 S/R, and 12 bits multi-turn over 4096 revolutions, with a DRIVE-CLiQ interface.
What mounting design and shaft does this motor have?
It has IM B5 (IM V1, IM V3) design and a plain shaft.
What connectors are provided?
The motor has M23 connectors for signals and power, and the connectors are rotatable.
Does the motor include a holding brake?
It has a permanent-magnet holding brake with 22.0 Nm holding torque.
What details should I provide for a quotation?
Provide the required quantity and destination, and include the requested date or project list context.
