Product information
Overview
Key Features
- Rated input: Input: 3 AC, 380 … 480 V +10 % -20 %, 47 … 63 Hz.
- Rated output power: Rated power: 30.00 kW | 30.00 hp at low overload; 22.00 kW | 25.00 hp at high overload.
- Overload capacity: Low overload: 30.0 kW at 150% for 3 s, 110% for 57 s and 100% for 240 s. High overload: 22.0 kW at 200% for 3 s, 150% for 57 s and 100% for 240 s.
- I/O interface: 6 standard digital inputs, 1 fail-safe digital input, 1 relay changeover contact, 1 transistor output, 1 differential analog input and 1 non-isolated analog output.
- Communication and control: Communication: PROFINET and EtherNet/IP. Supported control techniques include V/f linear / square-law / parameterizable, V/f with flux current control (FCC), V/f ECO linear / square-law and sensorless vector control.
- Protection and mechanical data: Degree of protection: IP20 / UL open type. Frame size: FSD. Dimensions: 200 mm width x 237 mm depth; net weight: 18.80 kg.
Technical Summary
| Product_lifecycle | Active Product |
|---|---|
| Input voltage | 380 … 480 V +10 % -20 % |
| Input frequency | 47 … 63 Hz |
| Rated power, low overload | 30.00 kW | 30.00 hp |
| Rated power, high overload | 22.00 kW | 25.00 hp |
| Communication | PROFINET, EtherNet/IP |
| Standard digital inputs | 6 |
| Fail-safe digital inputs | 1 |
| Control techniques | V/f linear / square-law / parameterizable; V/f with flux current control (FCC); V/f ECO linear / square-law; sensorless vector control |
| Degree of protection | IP20 / UL open type |
| Frame size | FSD |
Frequently Asked Questions
What is the exact Siemens model?
The exact model is Siemens SINAMICS G120C 6SL3210-1KE26-0AF1.
What input supply does this converter use?
Input: 3 AC, 380 … 480 V +10 % -20 %, at 47 … 63 Hz.
Which communication interfaces are provided?
Communication: PROFINET and EtherNet/IP.
What protection and frame size does it have?
Degree of protection: IP20 / UL open type. Frame size: FSD.
What information should I provide for a quotation?
Send the required quantity, destination and requested date for an MRO or project quotation.
