Product information
Overview
Key Features
- High-overload output: Rated power (HO): 15.00 kW | 20.00 hp, with 32.00 A rated current (HO).
- Light-overload output: Rated power (LO): 18.50 kW | 25.00 hp, with 38.00 A rated current (LO).
- Input supply: 3 AC input, line voltage 380 … 480 V ±10 %, line frequency 47 … 63 Hz, and rated current 30.00 A (HO) or 36.00 A (LO).
- Output control ranges: Output frequency: 0 … 200 Hz for vector control and 0 … 550 Hz for V/f control; pulse frequency is 4 kHz.
- Connections and motor cable: M6 bolt connections with 10.00 … 35.00 mm2 (AWG 8 … AWG 2) conductor cross-section; maximum motor cable length is 50 m (164.04 ft) shielded or 100 m (328.08 ft) unshielded.
- Mechanical protection: FSD frame size, IP20 / UL open type, dimensions 275 mm (10.83 in) × 512 mm (20.16 in) × 204 mm (8.03 in), and net weight 15.00 kg (33.07 lb).
Technical Summary
| Product | 6SL3225-0BE31-5AA0 |
|---|---|
| Product type | SINAMICS G120 PM250 Power Module |
| Input supply | 3 AC, 380 … 480 V ±10 %, 47 … 63 Hz |
| Rated power (HO) | 15.00 kW | 20.00 hp |
| Rated power (LO) | 18.50 kW | 25.00 hp |
| Output frequency for vector control | 0 … 200 Hz |
| Output frequency for V/f control | 0 … 550 Hz |
| Max. output current | 64.00 A |
| Integrated filter | Class A |
| Frame size | FSD |
| Degree of protection | IP20 / UL open type |
| Configuration | Without Control Unit and BOP |
Frequently Asked Questions
Is 6SL3225-0BE31-5AA0 the SINAMICS G120 PM250 Power Module?
Yes. It is a Siemens SINAMICS G120 PM250 Power Module, product 6SL3225-0BE31-5AA0.
What input supply does 6SL3225-0BE31-5AA0 use?
It has a 3 AC input with line voltage 380 … 480 V ±10 % and line frequency 47 … 63 Hz.
What protection and mechanical variant does it have?
It has IP20 / UL open type protection and FSD frame size. Dimensions are 275 mm (10.83 in) × 512 mm (20.16 in) × 204 mm (8.03 in).
Does this configuration include a Control Unit and BOP?
It is without a Control Unit and BOP.
What information should I provide for a quotation?
Provide the required quantity and destination; for project purchasing, also include the requested date and project list context.
