Product information
Overview
Key Features
- Rated power and overload: Rated power: 0.55 kW (LO) and 0.37 kW (HO). Low overload: 150% for 3s, 110% for 57s, 100% for 240s; high overload: 200% for 3s, 150% for 57s, 100% for 240s.
- Input supply: Input: 3 AC, 380 … 480 V +10 % -20 %, 47 … 63 Hz.
- Output performance: Output frequency: 0 … 240 Hz for vector control and 0 … 550 Hz for V/f control. Max. output current: 2.60 A.
- I/O interface: I/O interface: 6 digital inputs, 1 fail-safe digital input, 1 relay changeover contact, 1 transistor output, 1 differential input and 1 non-isolated analog output.
- Communication and control: Fieldbus: PROFINET. Communication interfaces also include EtherNet/IP. Supported control includes V/f linear / square-law / parameterizable, V/f with flux current control (FCC), V/f ECO linear / square-law and sensorless vector control.
- Connections and protection: Line, motor and DC link connections use plug-in screw terminals. Protection: IP20 / UL open type; frame size: FSAA.
Technical Summary
| Product | SINAMICS G120C compact converter |
|---|---|
| Order number | 6SL3210-1KE11-8AF2 |
| Input supply | 3 AC, 380 … 480 V +10 % -20 %, 47 … 63 Hz |
| Rated power, LO | 0.55 kW | 0.75 hp |
| Rated power, HO | 0.37 kW | 0.50 hp |
| Fieldbus | PROFINET |
| Communication | PROFINET, EtherNet/IP |
| I/O interface | 6DI, 2DO, 1AI, 1AO, 1 fail-safe digital input |
| Protection | IP20 / UL open type |
| Frame size | FSAA |
Frequently Asked Questions
What is the rated power of Siemens 6SL3210-1KE11-8AF2?
Rated power is 0.55 kW (LO) and 0.37 kW (HO).
Which control and fieldbus interfaces does this converter have?
It has PROFINET and EtherNet/IP communication, with 6DI, 2DO, 1AI and 1AO I/O. Supported control includes V/f control and sensorless vector control; encoder-based vector and torque control are not included.
Which connections and protection are provided?
Line, motor and DC link connections use plug-in screw terminals. Protection is IP20 / UL open type, with FSAA frame size.
What quantity and destination should be included in a quotation request?
Please provide the required quantity and destination, plus the requested date or project list context.
