Product information
Overview
Key Features
- Power module type: SINAMICS G120 PM 240-2 power module; push-through and unfiltered, with an integrated braking chopper.
- Supply: 200-240 V 3AC +10/-20%, 47-63 Hz.
- High overload: 22 kW at 200% for 3 s, 150% for 57 s, and 100% for 240 s; ambient temperature -20 to +50 °C (HO).
- Low overload: 30 kW at 150% for 3 s, 110% for 57 s, and 100% for 240 s; ambient temperature -20 to +40 °C (LO).
- Dimensions and protection: 615x354x237 mm (HxWxD); degree of protection IP20.
- Configuration and lifecycle: Without Control Unit and operating unit; released as of CU Firmware version V4.7 SP6. Product cancellation.
Technical Summary
| Product | 6SL3211-1PC31-1UL0 |
|---|---|
| Type | SINAMICS G120 PM 240-2 power module |
| Supply | 200-240 V 3AC +10/-20%, 47-63 Hz |
| High overload | 22 kW at 200% 3 s, 150% 57 s, 100% 240 s; ambient temperature -20 to +50 °C (HO) |
| Low overload | 30 kW at 150% 3 s, 110% 57 s, 100% 240 s; ambient temperature -20 to +40 °C (LO) |
| Construction | Push-through, unfiltered, integrated braking chopper |
| Protection | IP20 |
| Included configuration | Without Control Unit and operating unit |
| Firmware release | CU Firmware version V4.7 SP6 |
| Lifecycle | Product cancellation |
Frequently Asked Questions
What is Siemens 6SL3211-1PC31-1UL0?
It is a SINAMICS G120 PM 240-2 power module with push-through, unfiltered construction and an integrated braking chopper.
What are the high- and low-overload ratings?
High overload is 22 kW at 200% for 3 s, 150% for 57 s, and 100% for 240 s at ambient temperature -20 to +50 °C (HO). Low overload is 30 kW at 150% for 3 s, 110% for 57 s, and 100% for 240 s at ambient temperature -20 to +40 °C (LO).
What is included in this configuration?
It is without a Control Unit and operating unit.
What supply and protection details should be verified?
The supply is 200-240 V 3AC +10/-20% at 47-63 Hz, and the degree of protection is IP20.
What information should I provide for a quotation?
Provide the required quantity, destination, requested date, and project or MRO list context for quotation review.
