Product information
Overview
Key Features
- Motor ratings: PN=0.31 kW, UDC=300 V, M0=1.2 Nm (100 K), rated speed 3,000 rpm, and rated torque 1.0 Nm (100 K).
- Encoder feedback: Encoder IC22DQ incremental Encoder with 22-bit resolution, 4,194,304 resolution, encoder-internal 2048 S/R, commutation position 11 bits, and DRIVE-CLiQ interface.
- Mounting and shaft: IM B5 (IM V1, IM V3) design with rotatable power connector, M23 connector size, and shaft with fitted Feather key, tolerance N.
- Cooling and protection: Natural cooling; degree of protection IP65 and DE flange IP67.
- Brake and monitoring: Without holding brake and with a Pt1000 temperature sensor for temperature monitoring.
- Operating limits: Maximum permissible speed is 10,000 rpm mechanically and 6,400 rpm with inverter; maximum torque is 4.5 Nm and maximum current is 7.0 A.
Technical Summary
| Product | SIMOTICS S permanent-magnet synchronous motor |
|---|---|
| Order number | 1FK7032-2AF21-1DA2 |
| Rated power | PN=0.31 kW |
| DC link voltage | UDC=300 V |
| Rated speed | 3,000 rpm |
| Rated torque | 1.0 Nm (100 K) |
| Encoder | Encoder IC22DQ incremental Encoder, 22 bits, with DRIVE-CLiQ interface |
| Mounting | IM B5 (IM V1, IM V3) |
| Connector size | M23 |
| Cooling | Natural cooling |
| Protection | IP65 and DE flange IP67 |
| Holding brake | without holding brake |
Frequently Asked Questions
What encoder does Siemens 1FK7032-2AF21-1DA2 have?
It has an Encoder IC22DQ incremental Encoder with 22-bit resolution, encoder-internal 2048 S/R, commutation position 11 bits, and a DRIVE-CLiQ interface.
What mounting and connector configuration does this motor have?
It has IM B5 (IM V1, IM V3) mounting, an M23 connector size, and rotatable connectors for signals and power.
Does the motor include a holding brake?
It is without a holding brake.
What protection does this motor provide?
The degree of protection is IP65, with IP67 protection at the DE flange.
What should be included in a quotation request?
Provide the required quantity, destination, requested date, and any project list context for quotation support.
