Product information
Overview
Key Features
- Motor ratings: PN=0.47 kW, UDC=300 V, M0=1.6 Nm (100 K), rated speed 3,000 rpm and rated torque 1.4 Nm (100 K).
- Encoder feedback: Encoder IC22DQ: incremental Encoder 22 bits with resolution 4194304, encoder-internal 2048 S/R and commutation position 11 bits, with DRIVE-CLiQ interface.
- Mounting and shaft: IM B5 (IM V1, IM V3) design with M23 connector, flange 1, rotatable power connector and plain shaft with tolerance N.
- Brake and supply: Permanent-magnet holding brake with 1.9 Nm holding torque and DC 24 V ± 10 % power supply voltage.
- Cooling and protection: Natural cooling, IP65 protection and DE flange IP67 protection.
- Speed and current limits: Maximum permissible speed is 10,000 rpm mechanically and 5,200 rpm with inverter; maximum torque is 6.5 Nm and maximum current is 8.0 A.
Technical Summary
| Product type | Permanent-magnet synchronous motor |
|---|---|
| Rated power | 0.47 kW |
| DC link voltage | 300 V |
| Initial torque M0 | 1.6 Nm (100 K) |
| Rated speed | 3,000 rpm |
| Encoder | Encoder IC22DQ: incremental Encoder 22 bits, resolution 4194304, encoder-internal 2048 S/R, commutation position 11 bits |
| Encoder interface | DRIVE-CLiQ |
| Mounting design | IM B5 (IM V1, IM V3) |
| Holding brake | Permanent-magnet brake, holding torque 1.9 Nm |
| Cooling | Natural cooling |
| Protection | IP65 and DE flange IP67 |
| Electrical connectors | Connectors for signals and power rotatable |
Frequently Asked Questions
What encoder feedback does the Siemens 1FK7034-2AF21-1DH2 have?
It has an Encoder IC22DQ incremental Encoder with 22 bits, resolution 4194304, encoder-internal 2048 S/R, commutation position 11 bits and a DRIVE-CLiQ interface.
What mounting and shaft configuration does this motor use?
It uses IM B5 (IM V1, IM V3) mounting, a flange 1, an M23 connector, a rotatable power connector and a plain shaft with tolerance N.
Does the motor include a holding brake?
It has a permanent-magnet holding brake with 1.9 Nm holding torque and DC 24 V ± 10 % power supply voltage.
What quantity, destination and requested date should be included for a quotation?
Include the required quantity, destination and requested date so the Siemens item can be reviewed for an MRO or project quotation.
